PLAN OUTDOOR KITCHEN UTILITIES BEFORE YOU BUILD THE PATIO

The Best Time to Plan Utilities Is Before You Can See the Patio

A beautiful outdoor kitchen requires more than cabinets, countertops, and a barbecue.

Gas, electricity, water, drainage, lighting, and other infrastructure may need to reach the kitchen before the finished patio is installed.

Planning these items afterward can mean cutting through new concrete or removing finished paving.

A professional Outdoor Kitchen And Fire Features Contractor project should begin by understanding both the visible kitchen and the infrastructure required to support it.

Decide What Appliances You Want First

Utility requirements depend on the equipment.

A kitchen may include:

  • Built-in barbecue

  • Refrigerator

  • Sink

  • Side burner

  • Pizza oven

  • Ice maker

  • Lighting

  • Electrical outlets

  • Television

  • Heaters

  • Other appliances

The design should establish what is actually being installed before underground routes are finalized.

Gas Needs to Be Coordinated Early

Gas appliances may require properly designed gas service by the appropriate licensed professional.

The route should be considered before patios, walls, and permanent landscape features are completed.

Future additions should also be considered.

If a fire feature may eventually be added nearby, early planning can prevent unnecessary demolition later.

Electrical Planning Goes Beyond One Outlet

Outdoor kitchens can require electricity for:

  • Refrigerators

  • Lighting

  • Convenience outlets

  • Ignition systems

  • Televisions

  • Audio

  • Other equipment

Landscape and kitchen electrical requirements should be coordinated with the appropriately licensed electrical professional.

The surrounding Landscape Low Voltage Lighting plan should also be considered so the kitchen, pathways, planting, and gathering areas feel connected after dark.

Water & Drainage Need a Destination

If a sink is included, water supply and wastewater requirements need to be evaluated.

The patio itself also needs proper Drainage.

The finished kitchen should not create a low area where rainwater collects around cabinets, appliances, or seating.

Roof runoff becomes even more important when the kitchen is covered by a pergola or patio cover.

Install Sleeves Before Hardscape

A few thoughtfully positioned sleeves beneath future patios can make later improvements easier.

Possible future routes may include:

  • Lighting wire

  • Irrigation

  • Electrical

  • Gas

  • Water

  • Drainage

  • Audio

  • Other utilities

A complete Landscape Design Process helps coordinate these systems before the permanent surfaces are completed.

Design the Entire Outdoor Room

The kitchen should also have enough room for:

  • The cook

  • Open appliance doors

  • Bar stools

  • Guests

  • Serving

  • Walkways

  • Connections to dining and lounge areas

Infrastructure planning and space planning should happen together.

Build the kitchen on paper before you build it in concrete.